UPS Installation

Safe, certified installation and commissioning of your Riello UPS — from a single tower to a parallel multi-cabinet system.

A UPS is only as reliable as its installation. Our engineers handle delivery, positioning, cabling, earthing, battery commissioning and full load testing. We work around your operations to minimise downtime and leave you with a commissioned, documented and handed-over system.

— What's included

What we deliver

Delivery & positioning

Heavy-lift delivery and placement in your plant room or comms cabinet.

Power cabling

Input, output, bypass and battery cabling installed and terminated to standard.

Earthing & bonding

Correct earthing and neutral bonding for safety and signal integrity.

Battery commissioning

VRLA, Li-ion or supercap strings connected, tested and logged.

Load testing

Full load and bypass testing before we hand over.

Commissioning pack

Test results, commissioning certificate and handover documentation.

— How it works

The process

1

Pre-install survey

We confirm access, routes, floor loading and isolation points.

2

Programme & risk assessment

A method statement and programme that works around your uptime.

3

Install & commission

Our engineers install, connect, test and commission to the design.

4

Handover & training

We walk your team through operation, alarms and basic maintenance.

Ready to install?

Get a fixed-price installation and commissioning quotation.